Crothers Construction Pty Ltd constructed a new primary school on a tight deadline required by the Client to allow the school to commence operations in the following year. The school consisted of two teaching block buildings, an administration building and a multi-use canteen and covered assembly building including music room that were constructed using steel structural framework, internal and external face brick finish, Metal roofing and gutters and eye catching resilient floor coverings throughout.

The school includes fully reticulated landscaping, interactive LED screens in every classroom, motorised solar lighting and floorcoverings.

The school has paved footpaths linking all buildings and two separate playgrounds fully equipped with a gym and shade sails.